您当前的位置:主页 > 业务领域 > Prospecting >
Prospecting
Geothermal Spring Prospecting
来源:地大热能 2016-07-25
    Phase 1

    Basic geological survey, field geothermal geological survey, geochemistry survey, geophysical reconnaissance, special hydrogeologic survey, geothermal drilling and so on.

    Phase 2

    1.Analyze the metallogenetic mechanism and build conceptual model of the field geothermal hot spring. Design the geothermal well (location, depth, water temperature, quantity) accordingly;

    2.Perform the comprehensive assessment of the development and utilization of geothermal resource;

    3.Make the preliminary evaluation of field geothermal resource, including the feasibility assessment of the development of the hot spring resource and environmental impact assessment of the development and utilization, and so on.
 

推荐项目

News center

Projects show